Supporting High-Performance Housing Through Early Air Tightness Consultancy

Air Testing Wales

Our Client – Jones Brothers

End User: Wales & West Housing (WWH)

Main Contractor: Jones Brothers

Location: Priory Street, Carmarthen

Service: Air Tightness Testing & Consultancy

Project Target: Air permeability below 2.0 m³/(h·m²) @ 50 Pa

Air Testing

Project Overview

Melin Energy Consultants are providing specialist air tightness testing and air tightness consultancy services to support the development of a new residential scheme at Priory Street, Carmarthen, working in close collaboration with our client, Jones Brothers Ltd, on behalf of the end client, Wales & West Housing (WWH).

With increasing emphasis on energy efficiency, building performance and the delivery of sustainable housing across Wales, achieving excellent levels of air tightness is becoming increasingly important. This is particularly relevant to SAP assessments, the Welsh Development Quality Requirements 2021 (WDQR 2021) and the Welsh Government’s wider ambitions for low-carbon, energy-efficient homes as part of Wales’ transition towards net zero.

The development reflects WWH’s commitment to delivering high-quality, sustainable homes and its aspirations to push the performance of its new buildings beyond simply meeting minimum regulatory requirements. As part of those aspirations, the project team established an ambitious air permeability target of below 2.0 m³/(h·m²) at 50 Pa.

Achieving a figure at this level requires more than simply carrying out a final air test. It requires consideration of air tightness throughout the construction process, attention to detailing and workmanship, early identification of potential leakage paths and close collaboration between the contractor, site team and specialist consultant. This is where Melin have been involved from an early stage.

A Challenging Construction Method

One of the particularly interesting aspects of the Priory Street development is that the homes are being constructed using traditional cavity-wall construction, rather than a timber-frame system. While excellent levels of air tightness can certainly be achieved with cavity-wall construction, achieving very low air permeability figures can present additional challenges. The building envelope contains numerous junctions, interfaces and penetrations where maintaining continuity of the air barrier requires careful detailing and workmanship.

This makes the project’s target of below 2.0 m³/(h·m²) at 50 Pa a challenging objective. For Melin, this has meant that our involvement has needed to extend beyond simply attending site to undertake a test. We have worked alongside the Jones Brothers site team throughout the construction process, using preliminary testing as a means of monitoring the building’s performance and identifying opportunities for improvement.

Testing at the Right Stage

Working closely with Jones Brothers, Melin have been attending site to undertake preliminary testing at the first-fix/water-tight stage. This is a particularly valuable point in the construction programme. The building envelope is sufficiently complete to provide meaningful information about its air permeability, while many areas remain accessible for investigation and remedial works.

Rather than waiting until the final air test to discover whether the target has been achieved, the project team are able to understand how the building is performing while there is still time to react. Where areas of air leakage have been identified, Melin have provided diagnostic support to help establish the likely sources, allowing the site team to investigate and undertake remedial works before progressing further. The building can then be tested again to establish the effectiveness of those measures.

This approach turns air tightness testing from a final compliance exercise into an active quality-control process throughout construction.

A Proactive Approach from Jones Brothers

A major factor in the progress of the project has been the proactive approach taken by Jones Brothers and their site team. There have inevitably been some challenges along the way, with preliminary testing identifying areas where further investigation and remedial works have been required. However, rather than leaving these issues until later in the construction programme, the site team have responded immediately.

Where leakage has been identified, the team have investigated the findings, carried out remedial works and worked with Melin to establish whether the required improvement has been achieved. This willingness to engage with the testing process and address issues at an early stage has been fundamental to the progress being made.

The results so far are extremely encouraging, with the preliminary tests completed to date achieving air permeability figures below the project’s challenging 2.0 m³/(h·m²) target. Achieving these results through traditional cavity-wall construction is a testament to the care being taken by the Jones Brothers site team and the wider project team.

“Melin Energy Consultants have provided excellent support on our Priory Street development in Carmarthen. Their proactive approach to air tightness testing and technical advice has helped us identify and address issues early, with preliminary tests achieving results below our ambitious target of 2.0 m³/(h·m²) at 50 Pa.

Their expertise and collaborative approach have been invaluable in helping our team deliver high standards of construction quality.”

Simon Clancy, Project Manager, Jones Brothers

Melin’s Role – Air Tightness Consultancy Rather Than Simply Testing

Melin’s role on the Priory Street project has extended beyond providing an air test certificate. From the outset, we have worked with the project and site teams to provide ongoing air tightness consultancy, testing and diagnostic support. Our involvement has included:

  • Drawing review on site with project team
  • Early-stage air tightness testing at first-fix/water-tight stage
  • Monitoring progress against the project’s sub-2.0 air permeability target
  • Diagnostic testing to help identify potential leakage paths
  • Working with the site team to investigate areas requiring attention
  • Supporting the identification of potential air leakage through construction interfaces and junctions
  • Re-testing following remedial works
  • Providing ongoing technical support throughout the construction process

The benefit of this approach is that problems can be identified and addressed while they are still relatively accessible, rather than being discovered at the very end of the project when remedial works can be more disruptive, time-consuming and costly.

Shared Ambition for Better Performing Buildings

The success of the Priory Street project is not down to one organisation alone. It demonstrates the value of shared ambition and collaboration between the client, contractor, site team and specialist consultants.

WWH have established a clear and ambitious performance target as part of their wider sustainability aspirations for their new homes. Jones Brothers and their site team have embraced that ambition and demonstrated a proactive approach to construction quality, responding quickly when issues have been identified and continually working to improve the building’s performance. Melin have provided the specialist air tightness consultancy expertise, testing and diagnostics needed to monitor performance and support the site team throughout the construction process.

Each party has an important role to play, and the project demonstrates what can be achieved when those roles work together rather than treating air tightness as a final-stage compliance requirement.

Looking Ahead

With preliminary testing already demonstrating air permeability results below 2.0 m³/(h·m²) at 50 Pa, the project is progressing positively towards its ambitious air tightness objective. The work at Priory Street demonstrates the value of early engagement with air tightness specialists, particularly where a project has set a demanding performance target. By testing at first-fix/water-tight stage, identifying issues early, undertaking remedial works and re-testing, the project team are able to continually monitor and improve the building’s performance.

For Melin, the project is an excellent example of how our role can extend beyond simply measuring air permeability. By working alongside the contractor from an early stage, we can provide the testing, diagnostics and practical technical support required to help turn an ambitious air tightness target into measurable performance.

Melin are proud to be supporting Wales & West Housing and Jones Brothers on this project, and to play a part in helping deliver homes that reflect WWH’s sustainability aspirations and the care and commitment of the team delivering them.

 